At present, the central air conditioning system is widely used. The central air conditioning machine room adopts the traditional supply and installation mode. Usually, the construction unit purchases the main equipment of cold and heat sources according to the preliminary design of the Design Institute, and then the electromechanical installation company installs it on site.
Combined with many years of project site experience, our company has formed an energy-saving automatic control system of ultra-high efficiency full-automatic refrigerator room as the core, carried out secondary deepening design and three-dimensional simulation for the preliminary design of the Design Institute, and upgraded the ultra-high efficiency full-automatic assembly machine room from installation project to system product through factory prefabrication, module transportation and on-site assembly.
High efficiency and energy saving, single responsibility, space saving and shortening construction period
(1) From decentralized responsibility subject to single responsibility subject of system integrator
(2) From engineering projects to system products
(3) From project site construction to factory prefabrication production
(4) From independent control to efficient associated control
(1) Water pump module
(2) Water collector module
(3) 3D modeling picture
Website:www.szzonkin.com
Fax:0755-86092870
Tel:0755-86092805
E-mail:szzonkin@163.com
Add:room 1704, block a, building 7, international innovation Valley, Dashi 1st Road, Nanshan District, Shenzhen
Scan and contact wechat customer service